Patrike
05-30-2008, 05:02 PM
I could not see my self getting the Kyoto ready for the sunday event , so I stop working on it and I am tuning up my Patrike1 tadpole. Adding a rear bag rack ad tightening up the steering.
The big K will have to wait for a little bit. I did pick up the foam and vinyl for the seat but I gave wrong dimensions for them to cut the foam -- I know!!! measure twice and cut once. a Also got some better rod ends for the steering.
I went friday to an funiture reconvering place and the cheapest he had was some black that he tried to sell to me for 35 a meter -- I talked him down to 20$ a meter but I still did not buy. He gave me the "you can not find this material quality for less" line. I thanked him for his time and went that evening to a popular fabric store and got what looks like the same stuff for 9.98 a meter - thank you very much!
I will pick up some more foam next week and get back to work - middle June is now new dead line. Now I have more time to set up the power assist.
Later
Patrick
The big K will have to wait for a little bit. I did pick up the foam and vinyl for the seat but I gave wrong dimensions for them to cut the foam -- I know!!! measure twice and cut once. a Also got some better rod ends for the steering.
I went friday to an funiture reconvering place and the cheapest he had was some black that he tried to sell to me for 35 a meter -- I talked him down to 20$ a meter but I still did not buy. He gave me the "you can not find this material quality for less" line. I thanked him for his time and went that evening to a popular fabric store and got what looks like the same stuff for 9.98 a meter - thank you very much!
I will pick up some more foam next week and get back to work - middle June is now new dead line. Now I have more time to set up the power assist.
Later
Patrick